By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Pipeline PulsePipeline Pulse
  • Home
  • Oil
  • Featured
  • Gas
  • Refining & Processing
  • Exploration
  • Pipelines
  • Drilling
Reading: Technip Energies, JGC Win Abadi LNG FEED Contracts
Share
Notification Show More
Latest News
Business Physique Pays Tribute to Phil Kirk
Business Physique Pays Tribute to Phil Kirk
Oil
India Refiners Increase US Crude Buys
India Refiners Increase US Crude Buys
Oil
Fuel Remedy, Liquefaction Items of Congo LNG Part 2 Accomplished
Fuel Remedy, Liquefaction Items of Congo LNG Part 2 Accomplished
Oil
Technip Energies, JGC Win Abadi LNG FEED Contracts
Technip Energies, JGC Win Abadi LNG FEED Contracts
Oil
Summer season Buying and selling Stays Seasonally Skinny, Analysts Say
Summer season Buying and selling Stays Seasonally Skinny, Analysts Say
Oil
Aa
Pipeline PulsePipeline Pulse
Aa
  • About Us
  • Advertising Solutions
  • Privacy
  • Terms of Service
  • Podcast
  • Home
  • Oil
  • Featured
  • Gas
  • Refining & Processing
  • Exploration
  • Pipelines
  • Drilling
Have an existing account? Sign In
Follow US
Copyright © MetaMedia™ Capital Inc, All right reserved.
Pipeline Pulse > Oil > Technip Energies, JGC Win Abadi LNG FEED Contracts
Oil

Technip Energies, JGC Win Abadi LNG FEED Contracts

Editorial Team
Last updated: 2025/08/29 at 7:33 AM
Editorial Team 3 hours ago
Share
Technip Energies, JGC Win Abadi LNG FEED Contracts
SHARE


Technip Energies NV, along with JGC Holding Corp., secured a pair of Entrance-Finish Engineering Design (FEED) contracts for the Abadi liquefied pure fuel (LNG) mission being developed by INPEX Corp. in Indonesia’s Masela Block.

The primary contract is for the fuel Floating Manufacturing Storage and Offloading (FPSO) vessel and the second is for the onshore LNG facility, Technip Energies stated.

The FPSO FEED contract includes engineering a fuel FPSO for the Abadi fuel area. This unit will course of the fuel and export dry fuel through a subsea pipeline to the onshore LNG plant for liquefaction. The onshore LNG FEED contract consists of designing two LNG trains and supporting infrastructure together with a jetty, supplies offloading amenities, and a logistics provide base. Dry fuel from the FPSO will endure impurity elimination earlier than liquefaction, storage, and offloading. The carbon dioxide (CO2) captured from the dry fuel might be reinjected into the nicely.

- Advertisement -
Ad image

“LNG is a important transition gas for international power safety. We’re honored to be chosen as one of many FEED contractors for the 2 important parts of the Abadi Masela formidable improvement, leveraging our acknowledged experience in LNG and fuel FPSOs”, Marco Villa, Chief Enterprise Officer of Technip Energies, commented.

The Abadi LNG mission goals to offer 9.5 million tons of LNG a 12 months, together with an additional 150 million normal cubic ft of pure fuel per day for home use, Technip Energies stated.

Moreover, the mission incorporates carbon seize and storage expertise, which is according to Indonesia’s purpose of attaining net-zero CO2 emissions by 2060, the corporate stated.

“This mission represents a big step ahead within the improvement of low-carbon power options, incorporating CCS applied sciences to ship sustainable LNG, which is according to the course of our power transition technique”, Shoji Yamada, Consultant Director and President of JGC, stated.

To contact the writer, electronic mail andreson.n.paul@gmail.com


What do you assume? We’d love to listen to from you, be part of the dialog on the

Rigzone Vitality Community.

The Rigzone Vitality Community is a brand new social expertise created for you and all power professionals to Communicate Up about our trade, share information, join with friends and trade insiders and have interaction in an expert neighborhood that may empower your profession in power.






Supply hyperlink

You Might Also Like

Business Physique Pays Tribute to Phil Kirk

India Refiners Increase US Crude Buys

Fuel Remedy, Liquefaction Items of Congo LNG Part 2 Accomplished

Summer season Buying and selling Stays Seasonally Skinny, Analysts Say

Oil Climbs as Peace Discuss Prospects Fade

Editorial Team August 29, 2025
Share this Article
Facebook Twitter Email Print
Previous Article Summer season Buying and selling Stays Seasonally Skinny, Analysts Say Summer season Buying and selling Stays Seasonally Skinny, Analysts Say
Next Article Fuel Remedy, Liquefaction Items of Congo LNG Part 2 Accomplished Fuel Remedy, Liquefaction Items of Congo LNG Part 2 Accomplished
about us

Pipeline Pulse magazine is a preeminent digital publication in the petroleum industry, with a strong presence in the Middle East. Our esteemed digital publication is dedicated to providing cutting-edge insights on the international oil and gas industry, offering critical analysis of pressing issues and events, along with practical technology for designing, operating, and maintaining oil and gas operations.

Topics

  • Oil
  • Gas
  • Refining & Processing
  • Featured
  • Pipelines
  • Exploration
  • Drilling

Quick Links

  • About Us
  • Advertising Solutions
  • Privacy
  • Terms of Service
  • Podcast

Find Us on Socials

Copyright © Pipeline Pulse™ , All right reserved.

Join Us!

Subscribe to our newsletter and never miss our latest news, podcasts etc..

Loading
Zero spam, Unsubscribe at any time.

Removed from reading list

Undo
Welcome Back!

Sign in to your account

Lost your password?