By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Pipeline PulsePipeline Pulse
  • Home
  • Oil
  • Featured
  • Gas
  • Refining & Processing
  • Exploration
  • Pipelines
  • Drilling
Reading: Singapore Begins Constructing New Loading Facility for Trucked LNG
Share
Notification Show More
Latest News
Summer season Buying and selling Stays Seasonally Skinny, Analysts Say
Summer season Buying and selling Stays Seasonally Skinny, Analysts Say
Oil
Oil Climbs as Peace Discuss Prospects Fade
Oil Climbs as Peace Discuss Prospects Fade
Oil
CNOOC Ltd First Half Revenue Down on Decrease Costs
CNOOC Ltd First Half Revenue Down on Decrease Costs
Oil
Singapore Begins Constructing New Loading Facility for Trucked LNG
Singapore Begins Constructing New Loading Facility for Trucked LNG
Oil
Hibiscus Petroleum Indicators HoA for Manufacturing Tie-In with PVEP
Hibiscus Petroleum Indicators HoA for Manufacturing Tie-In with PVEP
Oil
Aa
Pipeline PulsePipeline Pulse
Aa
  • About Us
  • Advertising Solutions
  • Privacy
  • Terms of Service
  • Podcast
  • Home
  • Oil
  • Featured
  • Gas
  • Refining & Processing
  • Exploration
  • Pipelines
  • Drilling
Have an existing account? Sign In
Follow US
Copyright © MetaMedia™ Capital Inc, All right reserved.
Pipeline Pulse > Oil > Singapore Begins Constructing New Loading Facility for Trucked LNG
Oil

Singapore Begins Constructing New Loading Facility for Trucked LNG

Editorial Team
Last updated: 2025/08/28 at 7:19 PM
Editorial Team 7 hours ago
Share
Singapore Begins Constructing New Loading Facility for Trucked LNG
SHARE


State-owned Singapore LNG Corp. Pte. Ltd. (SLNG) has damaged floor for a brand new truck loading facility on Jurong Island, focused to be accomplished subsequent yr.

“The new and enhanced LNG truck loading facility can be a part of the SLNG Terminal, however segregated from the primary terminal operations. It can characteristic two loading bays, boosting operational capability and minimizing downtime, and is designed to accommodate 40-footer vehicles, in comparison with the present facility which solely helps 20-footer vehicles, enabling higher assist for the rising trucked LNG demand in Singapore”, SLNG stated in an announcement on its web site.

“The power can be geared up with onerous loading arms optimized for single-operator use, which helps to cut back manpower deployment and improve total operational effectivity”.

- Advertisement -
Ad image

China Worldwide Water & Electrical Corp. (S) Pte. Ltd. is the engineering, procurement and development contractor.

Presently the terminal provides round 50 p.c of the Southeast Asian city-state’s fuel demand for energy era, the remainder provided by pipeline, in keeping with SLNG. The terminal has a median fuel provide capability of 9 million metric tons each year (MMtpa) and a peak capability of about 11 MMtpa.  The terminal began operations Could 2013.

The present facility, occupying 40 hectares on the southern tip of Jurong, has two jetties, three 180,000-cubic-meter (6.36 million cubic toes) storage tanks and a fourth storage tank of 260,000 cubic meters. The terminal can accommodate LNG vessels starting from 2,000 cubic meters to 265,000 cubic meters in dimension, in keeping with SLNG.

Final yr SLNG signed agreements with Mitsui OSK Strains Ltd. (MOL), Jurong Port Pte. Ltd. and Wooden PLC to construct Singapore’s second LNG terminal.

MOL will constitution a newbuild floating storage and regasification unit (FSRU) with a storage capability of 200,000 cubic meters and a regasification capability of 5 MMtpa. The FSRU is to be constructed by Hanwha Ocean.

Anticipated to be put into operation by 2030, the FSRU will develop SLNG’s throughput capability as much as 15 MMtpa.

It will likely be berthed at Jurong Port, the place a connecting infrastructure can be constructed to attach the vessel to onshore pipelines and Singapore’s fuel pipeline community.

Wooden received the front-end engineering design contract, anticipated to be accomplished mid-2025, as introduced by SLNG October 23, 2024.

To contact the creator, electronic mail jov.onsat@rigzone.com


What do you suppose? We’d love to listen to from you, be part of the dialog on the

Rigzone Power Community.

The Rigzone Power Community is a brand new social expertise created for you and all vitality professionals to Converse Up about our business, share information, join with friends and business insiders and interact in knowledgeable neighborhood that can empower your profession in vitality.






Supply hyperlink

You Might Also Like

Summer season Buying and selling Stays Seasonally Skinny, Analysts Say

Oil Climbs as Peace Discuss Prospects Fade

CNOOC Ltd First Half Revenue Down on Decrease Costs

Hibiscus Petroleum Indicators HoA for Manufacturing Tie-In with PVEP

Alberta to Impose 2 % Levy on {Hardware} at Information Facilities

Editorial Team August 28, 2025
Share this Article
Facebook Twitter Email Print
Previous Article Hibiscus Petroleum Indicators HoA for Manufacturing Tie-In with PVEP Hibiscus Petroleum Indicators HoA for Manufacturing Tie-In with PVEP
Next Article CNOOC Ltd First Half Revenue Down on Decrease Costs CNOOC Ltd First Half Revenue Down on Decrease Costs
about us

Pipeline Pulse magazine is a preeminent digital publication in the petroleum industry, with a strong presence in the Middle East. Our esteemed digital publication is dedicated to providing cutting-edge insights on the international oil and gas industry, offering critical analysis of pressing issues and events, along with practical technology for designing, operating, and maintaining oil and gas operations.

Topics

  • Oil
  • Gas
  • Refining & Processing
  • Featured
  • Pipelines
  • Exploration
  • Drilling

Quick Links

  • About Us
  • Advertising Solutions
  • Privacy
  • Terms of Service
  • Podcast

Find Us on Socials

Copyright © Pipeline Pulse™ , All right reserved.

Join Us!

Subscribe to our newsletter and never miss our latest news, podcasts etc..

Loading
Zero spam, Unsubscribe at any time.

Removed from reading list

Undo
Welcome Back!

Sign in to your account

Lost your password?