By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Pipeline PulsePipeline Pulse
  • Home
  • Oil
  • Featured
  • Gas
  • Refining & Processing
  • Exploration
  • Pipelines
  • Drilling
Reading: New Coordinator for Baltic Grid Synchronization Mission as Deadline Looms
Share
Notification Show More
Latest News
Poland Says Key Infrastructure at Danger After Baltic Sea Incident
Poland Says Key Infrastructure at Danger After Baltic Sea Incident
Oil
QatarEnergy, ExxonMobil LNG Challenge to Begin Manufacturing This 12 months
QatarEnergy, ExxonMobil LNG Challenge to Begin Manufacturing This 12 months
Oil
Texas RRC Pronounces Milestone in Boots on the Floor Initiative
Texas RRC Pronounces Milestone in Boots on the Floor Initiative
Oil
Japanese Fuel Tanker Large Sees Issue Shopping for Chinese language Vessels
Japanese Fuel Tanker Large Sees Issue Shopping for Chinese language Vessels
Oil
Inpex Secures Extra Exploration Acreage offshore Indonesia
Inpex Secures Extra Exploration Acreage offshore Indonesia
Oil
Aa
Pipeline PulsePipeline Pulse
Aa
  • About Us
  • Advertising Solutions
  • Privacy
  • Terms of Service
  • Podcast
  • Home
  • Oil
  • Featured
  • Gas
  • Refining & Processing
  • Exploration
  • Pipelines
  • Drilling
Have an existing account? Sign In
Follow US
Copyright © MetaMedia™ Capital Inc, All right reserved.
Pipeline Pulse > Oil > New Coordinator for Baltic Grid Synchronization Mission as Deadline Looms
Oil

New Coordinator for Baltic Grid Synchronization Mission as Deadline Looms

Editorial Team
Last updated: 2025/01/10 at 10:36 AM
Editorial Team 4 months ago
Share
New Coordinator for Baltic Grid Synchronization Mission as Deadline Looms
SHARE


The European Fee has appointed a coordinator to make sure the completion of a undertaking to decouple the facility grids of Estonia, Latvia and Lithuania from Russia because the deadline looms, citing “pressing wants”.

“These 3 nations stay the final EU nations synchronized with networks of non-EU nations, on this case Russia (together with Kaliningrad) and Belarus”, the Fee stated in a web-based assertion.

“Their synchronization with the EU networks is among the most pressing priorities for EU power infrastructure, and has already obtained political, technical and monetary help for the previous 12 years.

- Advertisement -
Ad image

“With the goal date for finishing the synchronization in February 2025 and extra measures to be applied within the years to return, the Fee is eager to make sure the closest potential coordination between the respective EU nations and the Transmission System Operators”.

Catharina Sikow-Magny, the coordinator, beforehand served because the Fee’s director for the inexperienced transition and power system integration.

In November 2024, the transmission system operators of the three Baltic states introduced they’d collectively agreed to tug out of the BRELL settlement of February 2001, which hyperlinks them to a grid by which the electrical energy frequency is managed by Russia, on February 7, 2025.

Synchronizations assessments will then comply with, in accordance with statements by Estonia’s Elering AS, Latvia’s Augstsprieguma tīkls AS and Lithuania’s Litgrid AB.

On August 3, 2023, the governments of Estonia, Latvia and Lithuania agreed to quicken the decoupling undertaking and their integration with continental Europe practically a 12 months sooner than beforehand agreed, in a transfer prompted by Russia’s invasion of Ukraine.

Beneath a joint declaration by their prime ministers “the deadline for synchronization is introduced ahead from the top of 2025, as initially established by political declarations in 2018 and 2019, to February 2025”, the European Fee stated in a press launch then.

The August 2023 declaration cited dangers from the Russia-Ukraine battle. The battle, launched by Russia February 2022, “considerably deteriorated the power safety state of affairs within the area and elevated the dangers of unplanned de-synchronization of the Baltic states’ electrical energy techniques from IPS/UPS”, learn the textual content, referring to the grid system linking the three nations to Russia.

The three nations’ electrical energy provide techniques are already linked with European companions Finland, Poland and Sweden. “For historic causes, nevertheless, the Baltic states’ electrical energy grid continues to be operated in a synchronous mode with the Russian and Belarusian techniques”, the Fee defined. Estonia, Latvia and Lithuania had been a part of the Soviet Union.

The brand new declaration stated decoupling from the Russian system and “reaching power independence from Russia” are “tied to our safety and steady financial improvement”, including “the synchronization of the Baltic States with the Continental European Community holds strategic significance not just for us however for all the European Union”.

The three governments have agreed beneath the declaration to “redouble concerted efforts and full mobilization in guaranteeing political help for de-synchronization from IPS/UPS and reaching the synchronous operation of Baltic states’ electrical energy techniques with the Continental European Community not later than by February 2025”, said the textual content.

The synchronization is a precedence undertaking of the European Union and has obtained over EUR 1.2 billion ($1.24 billion) in funding from the Connecting Europe Facility for Power, the Fee stated on the time.

To contact the creator, e-mail jov.onsat@rigzone.com


What do you assume? We’d love to listen to from you, be part of the dialog on the

Rigzone Power Community.

The Rigzone Power Community is a brand new social expertise created for you and all power professionals to Communicate Up about our trade, share data, join with friends and trade insiders and interact in an expert neighborhood that may empower your profession in power.






Supply hyperlink

You Might Also Like

Poland Says Key Infrastructure at Danger After Baltic Sea Incident

QatarEnergy, ExxonMobil LNG Challenge to Begin Manufacturing This 12 months

Texas RRC Pronounces Milestone in Boots on the Floor Initiative

Japanese Fuel Tanker Large Sees Issue Shopping for Chinese language Vessels

Inpex Secures Extra Exploration Acreage offshore Indonesia

Editorial Team January 10, 2025
Share this Article
Facebook Twitter Email Print
Previous Article ICF Acquires Vitality Tech, Advisory Companies Agency AEG from Ameresco ICF Acquires Vitality Tech, Advisory Companies Agency AEG from Ameresco
Next Article Phillips 66 Carefully Monitoring California Fires Phillips 66 Carefully Monitoring California Fires
about us

Pipeline Pulse magazine is a preeminent digital publication in the petroleum industry, with a strong presence in the Middle East. Our esteemed digital publication is dedicated to providing cutting-edge insights on the international oil and gas industry, offering critical analysis of pressing issues and events, along with practical technology for designing, operating, and maintaining oil and gas operations.

Topics

  • Oil
  • Gas
  • Refining & Processing
  • Featured
  • Pipelines
  • Exploration
  • Drilling

Quick Links

  • About Us
  • Advertising Solutions
  • Privacy
  • Terms of Service
  • Podcast

Find Us on Socials

Copyright © Pipeline Pulse™ , All right reserved.

Join Us!

Subscribe to our newsletter and never miss our latest news, podcasts etc..

Loading
Zero spam, Unsubscribe at any time.

Removed from reading list

Undo
Welcome Back!

Sign in to your account

Lost your password?