By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Pipeline PulsePipeline Pulse
  • Home
  • Oil
  • Featured
  • Gas
  • Refining & Processing
  • Exploration
  • Pipelines
  • Drilling
Reading: JERA Decommissions 3.25 GW of Growing old Thermal Energy Capability
Share
Notification Show More
Latest News
Cenovus Sweetens Provide for MEG
Cenovus Sweetens Provide for MEG
Oil
SLB, SBM Enter Into Unique Digital Alliance
SLB, SBM Enter Into Unique Digital Alliance
Oil
LandBridge to Purchase Over 37,000 Acres in Delaware Basin
LandBridge to Purchase Over 37,000 Acres in Delaware Basin
Oil
OPAL Fuels, South Jersey Industries Begin Up RNG Plant
OPAL Fuels, South Jersey Industries Begin Up RNG Plant
Oil
Var Energi Raises Gjoa Manufacturing, Reserves
Var Energi Raises Gjoa Manufacturing, Reserves
Oil
Aa
Pipeline PulsePipeline Pulse
Aa
  • About Us
  • Advertising Solutions
  • Privacy
  • Terms of Service
  • Podcast
  • Home
  • Oil
  • Featured
  • Gas
  • Refining & Processing
  • Exploration
  • Pipelines
  • Drilling
Have an existing account? Sign In
Follow US
Copyright © MetaMedia™ Capital Inc, All right reserved.
Pipeline Pulse > Oil > JERA Decommissions 3.25 GW of Growing old Thermal Energy Capability
Oil

JERA Decommissions 3.25 GW of Growing old Thermal Energy Capability

Editorial Team
Last updated: 2025/10/03 at 9:31 AM
Editorial Team 5 days ago
Share
JERA Decommissions 3.25 GW of Growing old Thermal Energy Capability
SHARE


Japan’s JERA Co. Inc. has accomplished the decommissioning of Anegasaki Thermal Energy Station Models 5 and 6, Sodegaura Thermal Energy Station Unit 1, Chita Thermal Energy Station Unit 5, and Hirono Thermal Energy Station Unit 2. In a media launch, the corporate stated that the facility capability decommissioned totals 3,254 megawatts (MW).

JERA stated it’s changing getting old thermal energy era with state-of-the-art items, making certain a secure provide of electrical energy over the long run. The intention is to realize a decarbonized society, JERA stated.

JERA stated that for the reason that monetary yr (FY) 2020, it has carried out 7,310 MW of latest installations and replacements.

- Advertisement -
Ad image

As well as, JERA stated it’s transferring ahead with the brand new building of Chita Thermal Energy Station Models 7 and eight (1,319.8MW), aiming to begin operation in FY 2029.

“We’re additionally transferring ahead with deliberations regarding the new building of Sodegaura Thermal Energy Station Models 1 by 3 (approx. 2,600MW), aiming to begin operations as early as 2032, and have begun preparations for an environmental evaluation”, the corporate stated.

The ability era amenities to be decommissioned are getting old items whose degradation makes them troublesome to restart, JERA defined. JERA famous that below long-term deliberate shutdowns, these amenities haven’t been counted as producing capability with respect to the electrical energy supply-and-demand stability. Their decommissioning takes into consideration the state of latest installations and replacements and can due to this fact haven’t any affect on present electrical energy provide stability, the corporate stated.

“With the understanding and cooperation of native communities and different stakeholders, we’ll proceed working to make sure a secure provide of electrical energy in Japan and to realize a decarbonized society”, JERA stated.

To contact the writer, e-mail andreson.n.paul@gmail.com


What do you suppose? We’d love to listen to from you, be part of the dialog on the

Rigzone Power Community.

The Rigzone Power Community is a brand new social expertise created for you and all power professionals to Communicate Up about our trade, share information, join with friends and trade insiders and have interaction in an expert group that can empower your profession in power.






Supply hyperlink

You Might Also Like

Cenovus Sweetens Provide for MEG

SLB, SBM Enter Into Unique Digital Alliance

LandBridge to Purchase Over 37,000 Acres in Delaware Basin

OPAL Fuels, South Jersey Industries Begin Up RNG Plant

Var Energi Raises Gjoa Manufacturing, Reserves

Editorial Team October 3, 2025
Share this Article
Facebook Twitter Email Print
Previous Article Petronas Farms Down LNG Canada Stake to EIG Petronas Farms Down LNG Canada Stake to EIG
Next Article OPEC Seems Eager to Take away Voluntary Cuts Quickly OPEC Seems Eager to Take away Voluntary Cuts Quickly
about us

Pipeline Pulse magazine is a preeminent digital publication in the petroleum industry, with a strong presence in the Middle East. Our esteemed digital publication is dedicated to providing cutting-edge insights on the international oil and gas industry, offering critical analysis of pressing issues and events, along with practical technology for designing, operating, and maintaining oil and gas operations.

Topics

  • Oil
  • Gas
  • Refining & Processing
  • Featured
  • Pipelines
  • Exploration
  • Drilling

Quick Links

  • About Us
  • Advertising Solutions
  • Privacy
  • Terms of Service
  • Podcast

Find Us on Socials

Copyright © Pipeline Pulse™ , All right reserved.

Join Us!

Subscribe to our newsletter and never miss our latest news, podcasts etc..

Loading
Zero spam, Unsubscribe at any time.

Removed from reading list

Undo
Welcome Back!

Sign in to your account

Lost your password?